Solar Installation - 07/03/2014
A time lapse video of the antenna being installed from the installers prospective can be seen at: http://youtu.be/gNGzFUSKW38
A video slide show of the following images can be found at:
|
Ready for the 7 tonnes of concrete ... |
|
Chris and Chris, "delicately" aligning the tower into the correct orientation. |
|
Chris G6WHI, making up the wooden frame to align / level the base in the hole. |
|
Dave G0AYD, shifting the spoil ..... |
|
And Chris thought he had finished ........... OOPS ! |
|
David G0AYD, looks a little concerned ........
|
|
Frank G8FIJ looking very please with the assembled base. |
|
Original hole for the tower base, 1m x 1m x 1m, as per spec sheet - March 2013 |
|
The arrival of the tower - Sept 2012 |
|
Install of the 1st set of 250 AH batteries - For some reason people think I have a THING about petroleum jelly !!!!!! |
|
Left to Right - Jon G0IUE, David G0AYD, Dave G3ZXX - trying to remove a DEAD turbine from it's support mast - Summer 2011 ? |
|
Clem G3UGR, with the original 160 watt solar panel - 4th April 2008 |
|
Original antenna. |
|
Original installation. 1 kW turbine and antenna - Nov 2007.
|
|
Dave G3ZXX with the late Clem G3UGR (right), without whose invaluable work GB3JB would not exist - Nov 2007. |
|
Battery and equipment cabinet |
|